|
| Shea
Homes required the plant material
through the 3.6 mile artery of two planned communities to be
drought tolerant with drip irrigation. The design incorporated
provisions for future reclaimed water. The center island was
designed to flow with over 45 acres of County of Orange Scenic
Corridor parkway slopes. All work was coordinated with the Moulton
Niguel Water District. |
|
|